Blueberry Project
Overview :
A contract was signed to design, supply, and install 12 misting systems with low-pressure fogging for the Blueberry Project, owned by the National Protected Agriculture Company, within the Mohamed Naguib Agricultural Sector.
The scope of work, covering a total area of 120 hectares, included:
– Designing and executing the pumping and filtration station
– Installing automated operation panels for the system
– Supplying and installing backwashing panels for media and disc automatic filters
Project Name :
Blueberry Project
Duration :
Finished